Lochin 33 half models

Autor GrahamP74 4 zgłoszenia 15 lut 2021 — 4 kwi 2021
13Polubienia
3Komentarze
Rozdział 01 / 04

Rozdziały · 4 · przewiń, aby przeczytać

GrahamP74 Post otwierający

Lochin 33 half models

I have been asked by a skipper in Newquay to make another model of his boat. This time though he wants two half models to put on the wall either side of his booking office.
The hull has been made and sent to me for fitting out. This needs to be solid and weatherproof!
Polubione przez MouldBuilder and Martin555

Decks and cabin

I have made the decks and have used plastic boards for this.
Using export I have glued a baton onto the wall side of the model which will screw onto a backboard.
The foredeck has been stuck to the cabin which has been made out of a block of wood. Again this will be screwed to the backboard.
Polubione przez Ronald and Martin555

Lots to update!

Well since my last update I’ve been busy!
The boats are now attached to the back boards using silicone and some screws (just in case)! I’ve used a PVC paint to coat the decks and cabin which is great as it has created a rubber waterproof seal.
The detail has been added to the cabin and the railings have been made using white metal rod.
I’m happy with the symmetry, close enough and will never be next to each other so it’s not imperative that they are perfect!
Polubione przez Peejay and MouldBuilder and

Finished and off to their home!

The half boats are now finished and off to Newquay where a local business ‘Paddlefish Adventures’ will be using them on their booking office.
The detail is minimal because of the nature of their use.
Polubione przez Martin555 and jbkiwi

Delete this post?

Zostanie usunięte z serwisu.

Odrzucić tę wersję roboczą?

Twój szkic zostanie usunięty i nie można go odzyskać.

Masz niedokończony szkic

Co chcesz z tym zrobić?